We bring the tool up in stages after installation, check every subsystem against its specification and run the acceptance tests we agreed with you before handover.
Commissioning is the point where an installation either closes cleanly or turns into weeks of open issues. A tool that ran well before it was moved can still arrive with a loose connector, a shifted alignment or a gauge that drifted in transport. Methodical commissioning finds those issues in an order that keeps the tool and the people around it safe, and acceptance testing gives you a clear, measured point at which the tool is yours to run.
We agree the acceptance criteria with you before the tool leaves the old site, not after it arrives. For tools we sell, the starting point is the inspection report or the Certified test results, depending on the grade, and our test and certification work. The acceptance protocol states each test, how it is measured and the limit that counts as a pass.
A typical protocol covers:
After hook-up, we bring the tool up in stages. Control power and safety circuits come first, with every interlock and emergency off tested before any process function is enabled. Then cooling water, pneumatics and vacuum: pumps are started, the chamber pumped down and leak checked. Gases are introduced line by line once the vacuum is tight. RF, heaters and high-voltage supplies follow last.
Each stage is checked against the specification and recorded on a check sheet. Problems found early, such as a reversed phase or a leaking fitting, are fixed before they can damage something further down the line.
Once every subsystem is working, we run the acceptance tests with your team present. Results are recorded side by side with the values measured before shipping, so any change caused by the move is visible. If the protocol includes a test process, we run it on wafers and measurement tools agreed in advance.
A test that fails is investigated and repeated after the fix. Anything that cannot be closed during the visit goes on an open items list with an owner and a date, and the handover record says which items remain.
Commissioning a tabletop tool usually takes one or two days. A single-chamber process tool with gases and RF typically takes several days to a week. Cluster tools, implanters and furnaces can take longer, especially when a test process with metrology is part of acceptance.
You receive the acceptance protocol, commissioning check sheets, test results compared with the pre-shipment values, any open items and a signed handover record. These documents also form the baseline for later maintenance. Handover is usually followed directly by operator training on the commissioned tool.
Before the tool ships, we agree with you which tests it must pass at your site and what the limits are.
We power the tool up subsystem by subsystem, checking safety interlocks before process functions.
We test vacuum, gas, RF, thermal, motion and control functions against the specification.
We run the agreed tests with your team, record the results and hand the tool over.
200 mm (8 in) · 2000s–2020s
200 mm (8 in) · Late 1990s–2010s
150 mm (6 in) · 2000s–2020s
We agree them per tool. They usually cover base pressure and leak rate, gas flow and RF or heater function, interlocks and, where agreed, a test process with measured results.
Yes, if we agree the test process, the measurement method and the limits before the tool ships. Fixing those up front keeps unrelated process variables out of the test, so the result reflects the tool as far as possible.
Our engineer and a named person on your side, usually the lab manager or the tool owner. Agree who that is before commissioning starts, so sign-off does not wait for someone who was not there for the tests.
Commissioning can be booked for any tool, but As-is tools are sold without a tested specification, so we agree the scope and limits case by case.
Tell us the tool and what you need. We scope the work and send a written offer.